I run ops at a food distributor. The manual part that never goes away for us happens late at night.

The tool builds a clean plan in the evening. Then a truck goes down, or a store calls in a big add. Run the tool again and it moves stops on routes the loaders already started. Nobody wants that at 11pm.

So the planner moves a few stops by hand. It's not that they don't trust the tool. The tool just can't make a small change. It only knows how to start over.

I'd be curious if the survey split it out. How much of the hand work is the first plan, and how much is fixing it after things change?